Step Three: Install
Discharge Chute Crank
1. Remove gear cover from top of chute pedestal.
2. Slide Chute Crank through the nylon bushing in the support
bracket under control panel.
NOTE: Be careful not to damage nylon bushing when attaching
crank to the control panel.
3. Connect the chute crank to the pinion gear on discharge chute
with spring clip pin.
4. Replace gear cover on top of chute pedestal.
5. Orient the chute and pedestal to its most vertical position and
tighten pedestal hardware to 14.8-31.0 lbf-ft (20-42 N∙m).